When the Heating plus A/C contractor sent the lead Heating plus A/C worker to bring a full crew of Heating plus A/C trainees to our apartment to install the Heating plus A/C system, I knew.
So long as they were getting the task done, I didn’t care if they sent a dozen people to the house.
What frustrated me was that they had ten people at the house, plus it still took a few days to have the installation completed. I was sure it took less time to install the Heating plus A/C systems at the local church than it did to install ours. My partner Jim plus I were going on a getaway, plus I was hoping they would complete the installation before Jim and I left, but the situation was looking grim. The longer they worked, the less they seemed to get done. Jim and I purchased the current Heating plus A/C system in between seasons. Jim and I didn’t need heating or a/c and my pal and I knew my pal and I would be okay in the house. Jim and I were told normally it takes two days to install both heating plus a/c systems, plus it would not interfere with our getaway plans; Four days later, Jim and I were packing for our trip, plus the a/c hadn’t yet been touched. I didn’t know that it would take so long to install AC, even though I was wrong. It took two full days for them to make sure the a/c was installed properly, plus then they had a quick Q&A session in our backyard. They finally finished the installation process plus were heading out when the bus arrived to take us to the airport. I could not see why they took that long to complete the installation, even if they had new trainees with them.