I thought I had all the answers even before the HVAC supplier showed up at the house, and our a/c component was broken, plus the boiler was aging.
I was sure he was going to look at the a/c component plus tell us it needed to be replaced.
I was going to tell him to install a modern HVAC system in the house, instead of just replacing the a/c. I didn’t want a central HVAC. I wanted something that would be less toil plus cleaner to run. I was going to have him order plus install ductless HVAC for my home. The morning the HVAC supplier was supposed to arrive, I was up early, plus waiting for him. I knew he had a three-hour window, however my appointment was for 8 AM. How much later could he be so early in the morning? He didn’t arrive until almost 10 AM, which had me slightly upset. He went right to toil on the a/c, plus I was waiting for him to tell me the AC component could not be fixed. Instead, he told me it was just a matter of putting some coolant in the a/c unit, plus it would be fine. I was angry. I asked him what kind of HVAC supplier he was so that he could not tell me the a/c component was broken so I could get a modern HVAC system? He told me if I wanted a modern HVAC system that was fine, but he wasn’t going to lie plus tell me the AC component wasn’t fixable. I felt stupid after talking to the HVAC supplier, because he thought I wanted him to forget about being an HVAC tech plus just tell me what I wanted to hear.